Universities |
- University of Kansas
Lawrence, KS
Nichols Halls/Phase Two
Tripolymer Installer: C.P. Chemical CO, Inc. & Walter J.
Hasselman Contracting, Inc.
Tripolymer foam pumped under concrete floor slab to stabilize floor
from settling
|
- Princeton Theological Center,
Princeton University
General Contractor: Telesis Construction
Tripolymer Installer: Applied Thermal Technology
Insulation installed in cavity between building structure and newly
installed windows
|
- Pittsburgh University
Engineer: Frank Adams
Tripolymer Installer: Walter J. Hasselman Contracting, Inc.
2403 Sidney Street
Pittsburgh, PA
Thermal insulation of 38" void between parking structure and
university medical center (9 floors)
|
- Long Island University
Tripolymer Installer: Gotham Construction CO.
205 East 42nd Street
New York, NY
Pipe chase insulation / exterior walls
|
- Colorado State University
General Contractor: Drahota Construction CO.
Tripolymer Installer: Foaming America
P.O. BOX 272269
Ft. Collins, CO
Sound proofing of 33,000 linear feet of 3 5/8" wall in
dormitories bldgs.
|
- Institute of Advanced Studies
Princeton, NJ
Michael Landau Associates P.A.
General Contractor: Telesis Construction
Tripolymer Installer: Applied Thermal Technology
Sound proofing / thermal insulation of exterior and party walls of
student dormitories.
|
- University of Kansas
Robert Dole Human Development Building
Architects: Kiene & Bradley
Topeka, KS
Tripolymer Installer: Dahlstrom & Ferrel Const. CO
Topeka, KS
Thermal (veneer fill) between bricks & blocks
|
Schools |
- Fink Elementary School
Middle Town, PA
General Contractor: Lester P. Eshelman, Inc.
1035 Marietta Avenue
Lancaster, PA
Tripolymer Installer: Applied Thermal Technology
12" block core fill and 2" void between block and
veneer
|
- Norwood Park School
5900 N. Nina Avenue
Chicago, IL
General Contractor: General Building & Maintenance
4338 West Montrose Ave.
Chicago, IL
Tripolymer Installer: Walter J. Hasselman Contracting, Inc.
Insulation of heating and air conditioning ducts above all hallways
and classrooms
|
- Winsor Elementary School
Winsor, CT
Tripolymer Installer: C.P. Chemical CO, Inc. & Walter J.
Hasselman Contracting, Inc.
Thermal insulation
|
- The School Board of St. Lucie
2909 Delaware Ave
Fort Pierce, FL
General Contractor: Pepper Southern Inc.
Maitland, FL 32751
Tripolymer Installer: Lanier Foam Products
Thermal insulation
|
- Bunnell High School
Bunnel, FL
Tripolymer Installer: Lanier Foam Products
Mac Arthur Avenue
Orlando, FL
Thermal insulation of exterior C. M. U. walls
|